2026-09-24·vanven News
We have completed production and shipment for a hospitality project covering guest-room doors, corridor assemblies, integrated wall panelling and loose cabinetry.
Why one batch matters
All elements for the project were produced from the same board stock and the same locked paint batch. This is the detail that decides whether a hotel corridor still matches the show room two years later — and it is the most common problem when doors, wardrobe fronts and wall panels are ordered from different suppliers.
Project packaging
- Doors labelled by floor and room number
- Hardware sets packed with each leaf
- Wall panels and cabinetry packed by room
- Packing list matched to the floor plans
You can see project photography and video on our hotel project case study page.